What do I need when scheduling an inspection?

You will need the building permit number which is located on the placard or receipt provided at the time of permit issuance. For temporary or permanent electrical power inspections, the nine digit AEP work order number will be required in addition to the permit number before the inspection can be scheduled.

Show All Answers

1. When is a permit required?
2. When is a permit not required?
3. What are penalties if I do not apply for a permit?
4. What types of permits are issued?
5. What is required for a permit?
6. What are some building requirements specific to the county?
7. Who may apply for a building permit?
8. What are hours of operation?
9. What forms of payment are acceptable?
10. When are requested inspections scheduled?
11. What are the fees associated with permits?
12. Do I need to be present for the inspection?
13. When is the best time to speak with an inspector?
14. What do I need when scheduling an inspection?
15. What inspections are required on my permit?
16. Where can I access a code book?
17. What codes are adopted in Virginia?
18. What is a manufactured home and differences between them and modular/stick built homes?
19. What steps are involved in obtaining a manufactured home permit?
20. What are recommendations made to the Franklin County Building Inspection Department?